Ensham Life of Mine extension project
Project overview
Current stage
- Environmental Impact Statement (EIS) process completed
Description
- Extension of the existing Ensham Mine
- Single seam, underground bord and pillar mining operations to extract thermal coal at the current planned production rate of 4.5 million tonnes per annum within existing mining leases and extension into a new mining lease area
- Use of existing underground and surface infrastructure including road, rail and mine infrastructure equipment
- No additional surface infrastructure or surface disturbance within the new mining lease area
Proponents
Ensham Join Venture including:
- Idemitsu Australia Resources Pty Ltd
- Bligh Coal Limited
- Bowen Investment (Australia) Pty Ltd
Location
- Approximately 35 kilometres (km) east of Emerald and 49km north-west of Blackwater in Central Queensland
Local government
- Central Highlands Regional Council
Lifespan
- Extension of existing mine to approximately 2037
Jobs
- Maintaining current operational workforce of approximately 603
- No construction workforce
Commonwealth approval needed
- Yes (controlled action EPBC 2020/8669), single EIS assessment process for Queensland and the Commonwealth.
Environmental impact statement (EIS)
The EIS Assessment Report was issued to the proponent on 9 November 2021 in accordance with section 60 of the Environmental Protection Act 1994 (EP Act). The EIS process under Chapter 3, Part 1 of the EP Act is now completed.
Notice and documents
Publicly available documents can be obtained by accessing the links below or by contacting Idemitsu by phone 1800 290 620, email enquiries@idemitsu.com.au.
- EIS Assessment Report
- EIS documents
- Final terms of reference
Superseded documents
For further information about the EIS process for this proposal, contact the EIS Coordinator (Ensham Life of Mine Extension Project) on 13QGOV (13 74 68) or email eis@des.qld.gov.au.