- Construction and operation of a greenfield, open-cut bauxite mine, extracting up to 15 million tonnes per year of run of mine (ROM) bauxite ore and associated infrastructure.
- Construction and operation of an accommodation village for up to 280 persons.
- Construction and operation of an instream water supply dam.
- Screening and washing of bauxite ore in an on-site beneficiation plant.
- Construction and operation of a product haul road and coastal loading facility for loading of product bauxite onto a transhipment vessel.
- Transhipment of product bauxite onto an ocean going vessel for export.
Proponents
- Unincorporated joint venture between Glencore Bauxite Resources Pty Ltd (wholly owned subsidiary of Glencore plc) and MDP Bauxite Pty Ltd (wholly owned subsidiary of Mitsubishi Corporation)
Location/s
- Approximately 35 kilometres (km) south of Weipa and 23 kilometres (km) north-east of Aurukun on the Cape York Peninsula
Local government/s
- Aurukun Shire Council and Cook Shire Council
Lifespan
- Approximately 25 years (including 2 years construction)
Jobs
- Up to 350 (construction)
- Approximately 400 (operation)
Commonwealth Approval needed
- Yes (accredited assessment process under Commonwealth Environmental Protection and Biodiversity Conservation Act 1999; EPBC 2020/8624), single EIS assessment process for Queensland and the Commonwealth
Environmental impact statement (EIS)
The process for the assessment of this project is as follows:
- Submission of draft TOR
- Public notification of draft TOR
- Final TOR issued (EIS in preparation)
- Public notification of EIS
- Proponent responds to submissions
- Project assessment report
The proponent is currently responding to submissions.
View the EIS online. Electronic copies can be ordered by phoning the proponents on +61 7 3833 8500 or emailing aurukun@glencore.com.au
Privacy Statement
Please note it is a statutory requirement that all submissions (including names and addresses) will be provided to the proponent as required under section 56 of the EP Act, so that they may consider them and provide a response to the department. This consultation is a public process, and any submission you provide may be published (including online) and may be transmitted outside of Australia. You may wish to bear this in mind when providing your submission. Your information will not be disclosed by the department to any other parties unless authorised or required by law.
Notices and documents
Publicly available documents can be obtained by accessing the links below or by contacting the proponents on +61 7 3833 8500 or emailing aurukun@glencore.com.au.
- s51-52 public notice
- Final terms of reference
- s42 public notice
- Initial advice statement
- Draft terms of reference
For further information about the EIS process for this proposal, contact the EIS Coordinator (Aurukun Bauxite Project) on 13QGOV (13 74 68) or email eis@des.qld.gov.au